5. ENGINE REMOVAL/INSTALLATION DOWNTOWN 125i INSTALLATION Installation is in the reverse order of removal. Tighten the engine mounting bolt/nut to the specified torque. Torque: 5 kgf-m (50 N-m) Tighten the right and left rear shock absorber lower mount bolts to the specified torque. Torque: 4.0kgf-m (40N-m) Install the rear brake caliper and tighten the mount bolts to the specified torque. Torque: 3.2 kgf-m (32 N-m, 23 lbf-ft) After installation, inspect and adjust the following: · Throttle grip free play · Fill the cooling system with coolant and start the engine to bleed air from the system. API/ABV Reset(Refer to chapter14 page 17) 5-7